How the “Issue Picker and Linker” works after end user actions ?
1 How-To Video
2 Which changes are considered by the app ?
The following end users' changes are considered by the logic of the app
Single / Multiple Issue Picker Linker Change: The end user uses the custom field to search Issues and to select the right issue (Single) or Issues (Multiple). That can be done
in the create screen or
in the edit screen or
in any transition screen
Link Changes: The end user adds or deletes Links which are used by the Single / Multiple Issue Picker Linker to link selected Issues
3 Which actions are executed automatically by the app ?
End User Action | Link Type | Sync Link Changes | Action |
---|---|---|---|
Single / Multiple Issue Picker Linker Change | Selected | – | Delete all previous existing links corresponding to the configured Link Type and create new Links only to the selected Issues in the Single / Multiple Issue Picker Linker Field. |
No Link Type | – | No Link Changes | |
Link Changes | Selected | Checked | Based on the Link Change done by the end user (Delete / Add) the Single / Multiple Issue Picker Linker Field will be updated automatically |
Selected | Unchecked | No Change of the Custom Fields | |
No Link Type | – | No Change of the Custom Fields |